Menu Close

Bridge Building (SO)

Bridges and dimension drawings are to be built prior to day of testing. There are no specific tasks or tools needed at the time of competition. Bridges are to be built per bridge building contest regulations. Be sure to review pictures in section VI of contest rules to understand the rod and loading block physical requirements for testing. Include the contestant/entry number, which is assigned during registration, on the drawing (and/or bridge) to identify for scoring.

Bridges are to be checked-in at the bridge building competition site/booth from 8-10 am, April 12th.