Menu Close

Bridge Building (SO)

Contest Coordinator: Kipp Williams

Bridges and dimensioned drawings are to be completed prior to competition day.

Load testing the bridges are conducted the day of competition. There are no specific tasks or tools needed at the day of the competition.

Bridges are to be built per bridge building contest regulations. Be sure to review pictures in Section VI Testing (on pages 3 and 4) of contest regulations to understand the rod and loading block physical requirements used for loading. Include the contestant entry number, which is assigned during registration, on the drawing and bridge to identify for testing.

Bridges are to be checked-in at the bridge building competition site/booth between 8am-10am Friday morning.